LINK Systems LinkNet I User Manual
Page 46
LinkNet
A.6
manual rev 2.1 March 25, 1999
A.3.5 OmniLink Die Protection Module Software
Upgrade Procedure
This upgrade procedure applies only if the
OmniLink control has an extended card rack and has
the die protection module installed.
@
Review the chip changing rules of section A.1.
@
Remove power from the OmniLink card rack
and
the OIT.
@
Remove the Die Protection board from the card
rack.
@
Using Figure A.9, locate chip 5000-7 and
remove it.
Figure A.9:
OmniLink 5000 Die Protection
Module Circuit Board.
@
Insert the new 5000-7 chip.
@
Insert the Die Protection board in the card rack.
A.3.6 OmniLink Tonnage Monitor Module
Software Upgrade Procedure
This upgrade procedure applies only if the
OmniLink control has an extended card rack and has
the tonnage monitor module installed.
@
Review the chip changing rules of section A.1.
@
Remove power from the OmniLink card rack
and
the OIT.
@
Remove the Tonnage Monitor Module from the
card rack.
@
Using Figure A.10, locate and remove the 5000-
8 chip.
Figure A.10:
OmniLink 5000 Tonnage Monitor
Module Circuit Board.
@
Insert the new 5000-8 chip.
@
Insert the Tonnage Monitor Module in the card
rack.