Unit - ducted evaporative air conditioner, Ductwork, Site – Bonaire Touchpad User Manual
Page 54: Customer hand over

M
ULTI
-A
PPLIANCE
T
OUCH
P
AD
Controls – Installation / Setup / Commissioning
U
NIT
-
D
UCTED
E
VAPORATIVE
A
IR
C
ONDITIONER
The water supply line has been flushed to clear swarf and debris and is free of leaks.
The tank is free of foreign matter and debris and the water isolating tap is turned ON.
Water drainpipe work is completed and sealed.
The water basin fills with water and the float valve closes correctly when the water level is 65-70mm
below the overflow level.
The water pump operates correctly when turned ON at the controller.
The Dialflo water bleed rate is adjusted to suit local water conditions.
The Dump Valve. The tank drains correctly when unit turns off.
The fan deck is correctly located and the fan blade spins freely.
The fan operates through the entire speed range.
The minimum fan speed is correctly set.
Water distribution is even with the filter pads fitted and the air conditioner operating pump and fan.
D
UCTWORK
All ductwork is completed to plan, correctly supported and airtight, with no bend less than 1.5 x the
ductwork diameter.
Air distribution checked, dampers are adjusted and all outlets correctly adjusted and wiped clean.
All roof penetrations are fully sealed and watertight.
Manhole cover replaced.
S
ITE
All rubbish has been removed from inside and on the roof.
C
USTOMER
H
AND
O
VER
The operation of the Controller.
The need to open windows and doors for the correct operation of Fresh Air Conditioning
The operation of the bleed or dumping system and it’s importance to operate all the time in ducted
evaporative air conditioning
Maintenance requirements
Bonaire Control Systems
Page 54