beautypg.com

Checking the ultimate vacuum – VACUUBRAND PC 3012 VARIO plastic housing User Manual

Page 119

background image

page 119 of 129

If the pump does not achieve the ultimate vacuum:

- Whenever the diaphragms and valves have been replaced, a break-in

period of several hours is required before the pump achieves its ulti-

mate vacuum.

- In case of an unusual noise, switch off pump immediately and check

clamping disc positions.

If the specified ultimate vacuum is not achieved, and if this does not

change after the break-in period:

Check hose connectors at pump heads for leaks. If necessary recheck

valve seats and pump chambers.

Reassembling the pump with pumping units

PC 3010/3012 VARIO:

Lay the pump on its side with the rating plate of the pump at the top.

Support pump appropriately.

+

Note that to install the base plate, the exhaust waste vapor condenser

and the condensate flask have to be on top.

Push the console over the threads at the pump feet.

Install the serrated washers. Install the hex nuts and tighten using an

open-ended wrench (w/f 10). Place the pumping unit in normal operat-

ing position.

Attach the connecting hose between the pump and the exhaust waste

vapor condenser at the inlet of the condenser. Connect the exhaust

waste vapor condenser to the coolant circuit. Plug VACUU•BUS cable

into the controller.

Checking the ultimate vacuum

After any intervention at the equipment (e.g., repair / maintenance)

the ultimate vacuum of the pump has to be checked. Only if the pump

achieves its specified ultimate vacuum, the pump’s leak rate is low

enough to ensure that no explosive atmospheres will occur in the inte-

rior of the equipment.

After any intervention at the vacuum sensor the leak rate of the equip-

ment has to be checked.