Index – Reznor MASA Unit Installation Manual User Manual
Page 39

Form I-COND, P/N 220746R6, Page 39
INDEX
A
Acid Test 31
B
C
Checklist Prior to Start-up 23
Replacement Compressors 29, 30
Condensing Unit, Location of Piping
D
Diagram, Analog Control Connection
Diagram, Digital Control Connection
E
Evaporator Coil, Location of Piping
F
Final Checks and Start-Up 23, 24
H
HAZARD INTENSITY LEVELS 3
High Pressure Cutoff 22
Hot Gas Bypass Valve Setting 22
I
INSTALLER MUST COMPLETE 40
L
Leak Test the Condensing Unit 16
Leak Test the Field-Installed Piping 17
Low Pressure Cutoff 22
M
O
Operation, Sequence of Cooling 24, 25
P
Piping, Length and Size of Refrigerant
Piping, Type and Size of Refrigerant 11,
R
R410A Refrigerant - IMPORTANT
Refrigerant, Pressure/Temperature
Chart for R-410A 37
Refrigerant Piping Connections 8
Refrigerant Piping Guidelines 11
Refrigerant Piping on a PreevA Split
System with the Condenser Unit
Refrigerant Piping on a PreevA Split
System with the Evapoator Unit
S
Supply Voltage 18
T
Thermal Expansion Valve Bulb 15
Thermal Expansion Valve 14
Thermostatic Expansion Valve Equalizer
U
V
Voltage Supply, Check 19
W
WorkSHEET for calculating the