4 monitoring of test resources, 5 basic safety precautions, 2 personnel training – KERN & SOHN ABJ 320-4NM User Manual
Page 13: 6 transportation & storage, 1 testing upon acceptance
![background image](/manuals/697265/13/background.png)
ABS-N_ABJ-NM-BA-e-1312
13
4.4 Monitoring of Test Resources
In the framework of quality assurance the measuring-related properties of the
balance and, if applicable, the testing weight, must be checked regularly. The
responsible user must define a suitable interval as well as type and scope of this
test. Information is available on KERN’s home page
regard to the monitoring of balance test substances and the test weights required for
this. In KERN’s accredited DKD calibration laboratory test weights and balances may
be calibrated (return to the national standard) fast and at moderate cost.
5 Basic Safety Precautions
5.1 Pay attention to the instructions in the Operation Manual
Carefully read this operation manual before setup and commissioning, even if you
are already familiar with KERN balances.
5.2 Personnel training
The appliance may only be operated and maintained by trained personnel.
6 Transportation & Storage
6.1 Testing upon acceptance
When receiving the appliance, please check packaging immediately, and the
appliance itself when unpacking for possible visible damage.