7 completing the installation, Completing the installation -11 – Cabletron Systems 6000 User Manual
Page 37
Completing the Installation
6E128-26, 6E138-25, 6E129-26 and 6E139-25 User’s Guide
3-11
a.
Check that the power is turned on for the device at the other end of
the link.
b.
Verify proper crossing over of fiber strands between the
applicable port on the 6E12X-26 and the fiber optic device at the
other end of the fiber optic link segment.
c.
Verify that the fiber connection meets the dB loss specifications
outlined in
If a link has not been established, contact Cabletron Systems Global Call
Center. Refer to
3.7
COMPLETING THE INSTALLATION
The 6E12X-26 and 6E13X-25 are now ready to be set up through Local
Management. Refer to
modules and 6C105 chassis.
NOTE
The port RX LED flashes green and amber during bootup.
See also other documents in the category Cabletron Systems Computer Accessories:
- 2E42-27R (164 pages)
- 6H122-16 (158 pages)
- 24 (35 pages)
- 9T427-16 (16 pages)
- bridges (132 pages)
- CSX200 (88 pages)
- 2208 (158 pages)
- SM-CSI1076 (69 pages)
- SEHI-22 (93 pages)
- 9T425-16 (40 pages)
- 1800 (448 pages)
- ESX-1380 (86 pages)
- DLE23-MA (202 pages)
- 2E43-51 (168 pages)
- 5000 (83 pages)
- 6H253-13 (62 pages)
- Lancast Media Converter 7000 (108 pages)
- SmartCell 6A000 (102 pages)
- 9G421-02 (12 pages)
- SEH-22 (56 pages)
- 9A000 (180 pages)
- SEH-24 (64 pages)
- 6E123-26 (184 pages)
- STS16-20R (258 pages)
- 2E43-27 (164 pages)
- Cabletron MicroLAN 9E132-15 (36 pages)
- 9F120-08 (28 pages)
- 9E428-36 (18 pages)
- Device Management Module Dec GigaSwitch (65 pages)
- ELS10-26TX (18 pages)
- MICROMMAC-22T (105 pages)
- CSX1200 (644 pages)
- 7H02-06 (36 pages)
- 150 (106 pages)
- 9F206-02 (10 pages)
- MMAC-Plus 9T122-24 (27 pages)
- SEH100TX-22 (52 pages)
- 7C03 MMAC (16 pages)
- 2H253-25R (64 pages)
- TRXI-42 (92 pages)
- 7C04 (150 pages)
- 2H22 (120 pages)
- 2000 (196 pages)
- 7C04 Workgroup (25 pages)