beautypg.com

Benchmark 6000 boiler, Installation, operation & maintenance manual – AERCO BMK 6000 User Manual

Page 4

background image

Benchmark 6000 Boiler

Installation, Operation & Maintenance Manual

Page 4 of 210

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

OMM-0086_0D

03/20/14

Ph.: 800-526-0288

GF-133

3.2 CONTROL PANEL DESCRIPTION ........................................................................................................................... 37

3.3 CONTROL PANEL MENUS ..................................................................................................................................... 41

3.3.1 Menu Processing Procedure ......................................................................................................................... 41

3.4 OPERATING MENU .............................................................................................................................................. 43

3.5 SETUP MENU ....................................................................................................................................................... 43

3.6 CONFIGURATION MENU ...................................................................................................................................... 44

3.7 TUNING MENU .................................................................................................................................................... 46

3.8 COMBUSTION CAL MENU .................................................................................................................................... 47

3.9 BST (Boiler Sequencing Technology ) Menu ........................................................................................................ 47

3.10 START SEQUENCE .............................................................................................................................................. 50

3.11 START/STOP LEVELS........................................................................................................................................... 55

CHAPTER 4.

INITIAL START-UP.......................................................................................................... 59

4.1 INITIAL START-UP REQUIREMENTS ...................................................................................................................... 59

4.2 TOOLS AND INSTRUMENTATION FOR COMBUSTION CALIBRATION ................................................................... 59

4.2.1 Required Tools & Instrumentation ............................................................................................................... 60

4.2.2 Installing Gas Supply Manometer................................................................................................................. 60

4.2.3 Accessing the Analyzer Probe Port ............................................................................................................... 61

4.3 PILOT IGNITION ................................................................................................................................................... 62

4.4 NATURAL GAS COMBUSTION CALIBRATION ....................................................................................................... 62

4.5 REASSEMBLY AFTER COMBUSTION CALIBRATION .............................................................................................. 67

CHAPTER 5.

MODE OF OPERATION .................................................................................................. 69

5.1 INTRODUCTION ................................................................................................................................................... 69

5.2 INDOOR/OUTDOOR RESET MODE ....................................................................................................................... 69

5.2.1 Reset Ratio .................................................................................................................................................... 69

5.2.2 Building Reference Temperature ................................................................................................................. 69

5.2.3 Outdoor Air Temperature Sensor Installation .............................................................................................. 69

5.2.4 Indoor/Outdoor Reset Mode Startup ........................................................................................................... 69

5.3 CONSTANT SETPOINT MODE ............................................................................................................................... 70

5.3.1 Setting the Setpoint ...................................................................................................................................... 70

5.4 REMOTE SETPOINT MODES ................................................................................................................................. 71

5.4.1 Remote Setpoint Field Wiring ...................................................................................................................... 71

5.4.2 Remote Setpoint Startup .............................................................................................................................. 72

5.5 DIRECT DRIVE MODES ......................................................................................................................................... 72

5.5.1 Direct Drive Field Wiring............................................................................................................................... 73

5.5.2 Direct Drive Startup ...................................................................................................................................... 73

5.6 AERCO CONTROL SYSTEM (ACS) .......................................................................................................................... 73

5.6.1 ACS External Field Wiring ............................................................................................................................. 74

5.6.2 ACS Setup and Startup .................................................................................................................................. 74

5.7 COMBINATION CONTROL SYSTEM (CCS) ............................................................................................................. 74

5.7.1 Combination Control System Field Wiring ................................................................................................... 75

5.7.2 Combination Control System Setup and Startup .......................................................................................... 75

CHAPTER 6.

SAFETY DEVICE TESTING ............................................................................................ 77

6.1 TESTING OF SAFETY DEVICES ............................................................................................................................... 77

6.2 LOW GAS PRESSURE FAULT TESTs ....................................................................................................................... 77

6.3 HIGH GAS PRESSURE FAULT TEST ........................................................................................................................ 79

6.4 LOW WATER LEVEL FAULT TEST .......................................................................................................................... 80

6.5 WATER TEMPERATURE FAULT TEST .................................................................................................................... 81

6.6 INTERLOCK TESTS ................................................................................................................................................ 82

6.6.1 Remote Interlock Test .................................................................................................................................. 82

6.6.2 Delayed Interlock Test .................................................................................................................................. 82

6.7 FLAME FAULT TESTs ............................................................................................................................................ 82

6.8 AIR FLOW FAULT TESTS ....................................................................................................................................... 83

6.8.1 Blower Proof Switch Test ............................................................................................................................. 84

6.8.2 Blocked Inlet Switch Test .............................................................................................................................. 85