IMPORTANT

Ensure that adequate clearance exists at the rear of the unit to permit
installation and service maintenance of the AERCO Condensate Trap. Refer
to section 2.7 for Condensate Trap installation details.

When using the AERCO Condensate Neutralizer Tank for condensate
drainage, the tank must be installed in a pit, OR the boiler and AERCO
Condensate Trap must be elevated higher than 4” above the floor. See
Condensate Neutralizer Tank Instructions TID-0074 for details.

Figure 2-2: Benchmark Boiler Model 6000 Clearances

Housekeeping pad