beautypg.com

Chapter 5 planning for installation and operation, 1 user responsibilities – Compaq 9900 User Manual

Page 95

background image

Hitachi Lightning 9900™ User and Reference Guide

81

Chapter 5 Planning for Installation and Operation

This chapter provides information for planning and preparing a site before and during
installation of the Hitachi Lightning 9900™ subsystem. Please read this chapter carefully
before beginning your installation planning.

If you would like to use any of the Lightning 9900™ features or software products (e.g.,
TrueCopy, ShadowImage, HRX, Hitachi Graph-Track), please contact your Hitachi Data
Systems account team to obtain the appropriate license(s) and software license key(s).

Note: The general information in this chapter is provided to assist in installation planning
and is not intended to be complete. The DKC410 and DKC415 (9960/9910) installation and
maintenance documents used by Hitachi Data Systems personnel contain complete
specifications. The exact electrical power interfaces and requirements for each site must be
determined and verified to meet the applicable local regulations. For further information on
site preparation for Lightning 9900™ subsystem installation, please contact your Hitachi Data
Systems account team or the Hitachi Data Systems Support Center.

5.1 User Responsibilities

Before the 9900 subsystem arrives for installation, the user must provide the following items
to ensure proper installation and configuration:

„

Physical space necessary for proper subsystem function and maintenance activity

„

Electrical input power

„

Connectors and receptacles

„

Air conditioning

„

Floor ventilation areas (recommended but not required)

„

Cable access holes

„

RJ-11 analog phone line (for Hi-Track

®

support)