6
R E L I A N C E S T O R M M A X I N S T A L L A T I O N M A N U A L
HW-200-01 anchor sleeve
(for design pressures above 70 psf)
HW-500 jamb mullion
HW-183-01
shear block
(4) FS-9
fasteners
(2) FS-320 drive screw
HW-338 jamb end cap
Apply sealant bed to entire
length of jamb mullion
HW-122 jamb filler
FS-322
fastener
locate 12" o.c.
1.3 a. Prior to HW-183-01 shear block attachment insert HW-200-01 anchor sleeves at jamb ends and match
drill .191 dia. hole. (this step is only required for design pressures above 70 psf.)
b. Attach HW-183-01 shear block to HW-500 jamb with FS-9 fastener.
c. Attach HW-122 jamb filler to HW-500 jamb using FS-322 fastener locate 12" o.c. (drill #11 - .191" clear hole in
HW-122 jamb filler and #25 - .1495" pilot hole in jamb) HW-122 filler should be bed in sealant.
tool sealant on gap space between HW-122 filler and jamb mullion.
d. Install interior FG-5185 spacer gasket cut to 2" from ends and 2" gaps at horizontal to allow for
zone plugs.
e. Install, seal and tool HW-338 end caps to top and bottom of jamb screw boss with
(2) FS-320 #10 x 1/2" drive screws.
Apply sealant bed to front edge of
mullion end prior to installation of
HW-338 mull cap
Apply sealant bed to entire front
edge of mullion end prior to
installation of HW-338 jamb cap
2"
Gap dimension for
WW-352 zone plug
FIGURE 1.3
JAMB FABRICATION
Apply sealant bed to
entire edge of mullion
end prior to installation
of HW-338 mull cap