3.5 a. After all pressure plates are installed on the frame, torque FS-325 screws to 90 in-lbs. The use of
either a drill motor with a torque limiter or torque wrench can be used. If using a cordless drill, check
torque periodically since battery usage will affect the torque setting.
b. Install vertical face covers. Using a wood block to protect the cover, apply with dead blow soft face
hammer. Pin the vertical face covers once per length as required, concealing pin at a horizontal
location.
c. Insert backer rod into cavity at the top of each vertical mullion. Seal off end of vertical, sloping sealant
back to marry with the perimeter seal. See
FIGURE 3.5a
d. Seal horizontal pressure plates against the vertical face covers. Tool sealant into the joint.
See
FIGURE 3.5b.
e. Install horizontal face covers, leaving an equal gap at each end. Make sure that the weep hole in the
face cover is on the top.
Backer rod & sealant in cavity
Perimeter seal
Mullion end cap
FIGURE 3.5a
Sealing Top of Captured Verticals
Weep Hole