Mid-pt-anchor-at-mullion – Oldcastle BuildingEnvelope Reliance StormMax User Manual
Page 34

31
R E L I A N C E S T O R M M A X I N S T A L L A T I O N M A N U A L
4.1 a. Install plumb and align vertical mullion. Drill appropriate sized holes for anchor bolts as shown on
approved shop drawings.
b. Insert a (minimum) 1/16" Koralath slip pad between the anchor and the tap plate prior to inserting
fasteners.
c. Insert anchor bolts through the mullion and install lock washers and nuts as required.
NOTE: Details shown are to used as a guide only. See approved shop drawings for actual conditions.
MID POINT ANCHOR AT MULLION
FIGURE 4.1