Edge Lighting Kurve Display Sign User Manual
Through-power angle and kurve display sign w/feed, Install the fixture, Installation instructions for

Installation Instructions for
Through-Power
Angle and Kurve Display Sign w/Feed
Install the Fixture
1718 W. Fullerton Ave
Chicago, IL 60614
Tel: 773-770-1195
Fax: 773-935-5613
www.edgelighting.com
© 2013 Edge Lighting. All Rights Reserved.
SAVE THESE INSTRUCTIONS!
- This instruction shows a typical installation.
IMPORTANT INFORMATION
1
hinge. Typically, the furthest left hinge contains the power
wires.
: Measure the distance from center of each hinge to the other
904-KAD-FTP-02
A
1
AD-7WDC-FTP-__
MEASURE
CHANNEL
B
2: Mark the measured points on the wall where the fixture is to
be mounted.
CHANNEL
HINGE
1
MARK
MEASUREMENTS FROM STEP 1
2
2
3: Using a 7/16" bit, drill out the left marked hole through the
front & back drywall surfaces.
C
DRYWALL
POWER
FEED HOLE
3
D
4: Insert and tighten the nipple into the back of the stem base
with threads, for the power feed.
NIPPLE
THREADED
STEM BASE
4
ANCHOR FOR
STANDOFF POST
WALL
5:
6:
Mark additional points at 0.6" to the top & bottom of the
drilled and marked points.
Use a hammer to tap in the anchors on the (new) marked
points up to the threaded portion.
7: Screw in the threaded portion of the anchors with a Phillips
screwdriver.
E
0.6"
APART
6
7
5
SIDE VIEW
NOTE:
The base holes should be in a vertical position at 90°
angle to the direction of the fixture.
HINGE
MARKED
POINT
0.6"
APART
NOTE:
Depending on fixture length, the fixture is provided with 2
to 4 hinges.
KD-7WDC-FTP-__
MARK