Edge Lighting Out-Riggers User Manual
Monorail out rigger power feed, Install the power feed canopy, Installation instructions for
SAVE THESE INSTRUCTIONS!
- This product is ETL listed for indoor dry locations.
- This product can be installed to a 4" electrical box with
round plaster ring, or to an octagon electrical box.
- Minimum electrical box volume must be 6 cubic inches
(98 cubic centimeters).
- This product should be installed by a qualified electrician.
A
1: Turn the power to electrical box off.
2: Connect each low voltage wire coming from the remote
transformer to one power feed canopy wire with a wire nut.
Installation Instructions for
Monorail Out Rigger Power Feed
Install the Power Feed Canopy
1
904-MP-4RD-OUT-02
IMPORTANT INFORMATION
1718 W. Fullerton Ave
Chicago, IL 60614
Tel: 773-770-1195
Fax: 773-935-5613
www.edgelighting.com
NOTE:
Use the universal round crossbar (provided) if the electrical
box holes are not spaced 2-3/4" apart.
NOTE:
The low voltage wires should be present in the electrical
box. Refer to the instructions provided with the remote
transformer to install the transformer and the low voltage wires
before proceeding with the steps below.
B
3: Place all wires and wire nut connections inside the electrical
box.
4: Secure the power feed canopy to the electrical box by
tightening the two provided #8-32 screws with the 3/32
Allen wrench.
3/32 ALLEN WRENCH
#8-32
SCREW
2
2
4
4
3
MP-4RD-OUT-_
© 2009 Edge Lighting. All Rights Reserved.