beautypg.com

Great Plains ADC2220 Predelivery Manual User Manual

Page 49

background image

3/3/2006

167-088Q-RUS

47

Implement Assembly

24160

24159

Refer to Figure 108

2.

Secure air tower to frame using u-bolt and hard-
ware.

Refer to Figure 109

3.

Attach 1 inch seed hoses from top of air tower to
openers.

4.

Attach 2 1/2 seed hose to bottom of air tower. Se-
cure with hose clamp.

Folding Hydraulic Cylinder

Refer to Figure 110

1.

Attach folding hydraulic cylinder (2) to arm on
wing frame.

2.

Insert bushing (1) through cylinder (2) and arm.

3.

Secure hydraulic cylinder (2) to arm on wing
frame. Use pin clevis (5), flat washer (3), and cot-
ter pin (4).

Figure 108

Securing Air Tower

Figure 109

Air Tower Hoses

24186

Figure 110

Hydraulic Cylinder