beautypg.com

Engage/disengage levers, Unload bins rack – Great Plains ADC2220 Predelivery Manual User Manual

Page 18

background image

167-088Q-RUS

3/3/2006

ADC2220 & NTA 3510

16

23450

Clutch Linkage Rod

Engage/Disengage Lever

23045

Engage/Disengage

Lever

Clutch

Linkage

Rod

Engage/Disengage Levers

Refer to Figure 22

1.

Remove flat washer and lock nut from bolt on clutch
linkage rod.

2.

Secure linkage rod to lever with flat washer and lock
nut.

NOTE: Leave bolts secured loosely. Do NOT tighten
bolts down as levers will not function properly. Refer to
Figure 22.

Unload Bins Rack

Refer to Figure 23

NOTE: The air drill cart and air drill implement are
shipped on racks via containers. There are three
racks total: the center section rack, the wing rack,
and the bins rack.

1.

Unload all loose pieces from bins rack. Keep all
pieces separate. NOTE: DO NOT try to un-
load weight brackets from rack. A forklift
will be needed to unload brackets.

Figure 22

Engage/Disengage Levers

23049

Figure 23

Bin Rack