beautypg.com

Bins – Great Plains ADC2220 Predelivery Manual User Manual

Page 29

background image

3/3/2006

167-088Q-RUS

27

Cart Assembly

Figure 53

View of Front Hopper from Above

Figure 54

View of Rear Hopper from Above

Front

Rear

Metering

Device

23257

Front

Rear

Metering

Device

23256

Bins

Refer to Figures 53 and 54

1.

Plastic tubes should be installed inside the
bins - two per bin.

2.

Install plastic tubes from rear of bin to rear
of metering device in front bin.

3.

Install plastic tubes from front of bin to rear
of metering device in rear bin.

NOTE: It is important that the plastic tubes are
installed properly to equalize air pressure. If
they are not installed correctly, the implement
may produce undesirable results.

Bin Lids

Refer to Figure 55

1.

Place bin lid on top of bin. Bin lid hinge will
bolt to bin on opposite side across from u-
bolt.

2.

Attach bin lid to top of bin using bolts and
flat washers.

3.

Secure lid with flat washers and lock nuts.

4.

Repeat steps 1-3 to attach second bin lid to
other bin.

23070

Figure 55

Bin Lid