beautypg.com

Great Plains ADC2220 Predelivery Manual User Manual

Page 20

background image

167-088Q-RUS

3/3/2006

ADC2220 & NTA 3510

18

23454

23453

Figure 29
Front Bin

Figure 28

Bin

Refer to Figure 27

5.

Unscrew and remove all bolts securing bin to
the rack.

6.

Using forklift or other implement, carefully
raise bin from rack.

Refer to Figure 28

7.

Once bin is removed from rack, carefully lower
bin on its side as shown in Figure 28. Remove
lift straps from forklift.

NOTE: Be careful when handling bins. To pre-
vent damage, bins should be supported at all
times.

8.

Gently maneuver bin to sit upright.

Refer to Figure 29

9.

Reposition lift straps on bin so bin may be
raised with forklift as shown in Figure 29.

10. Raise bin from ground using forklift.

23046

Figure 27

Remove Bolts