beautypg.com

Meterboxes – Great Plains ADC2220 Predelivery Manual User Manual

Page 23

background image

3/3/2006

167-088Q-RUS

21

Cart Assembly

23048

Figure 36

Align Rear Bin to Frame

23061

Figure 37

Bag of Hardware

Refer to Figure 36

21. Align holes in bottom of bin with holes in frame

so bin can secure to frame with bolts.

Refer to Figure 37

22. Secure bin to air drill cart frame using hard-

ware located in bags attached to the frame.

Meterboxes

Refer to Figure 38

1.

Place a thin bead of silicon around the top
edge of one meterbox (1). Attach meterbox (1)
to front bin with flared outlets toward the back.

2.

Use vise grips to hold meterbox (1) to bin. Se-
cure box (1) to bin using bolts (4), washers (2),
and nuts (3).

3.

Repeat steps 1-2 to attach second meterbox
to rear bin.

Front Bin

Rear Bin

Figure 38

Meter Boxes

23460

NOTE: ADC2220 frame is removed for clarity.