Install – Great Plains YP Fertilizer System User Manual
Page 15
Great Plains Mfg., Inc.
Installation Instructions
15
02/29/2008
407-197M
Install
Boom Mounts
76. Select:
77. If also installing the starter boom, select:
Refer to Figure 27
78. Install the fertilizer boom mounting brackets
of the 14 air pipe rest support brackets
positions closest to planter center.
At the outside positions, a full pair of bolts
lock nuts
are used to secure the bracket
under the rest supports
.
At inner positions, only one bolt
and lock nut
is used (at the rear hole). The forward hole is occu-
pied by the existing long bolt
and nut
the clamp plate
79. Loosely attach a center boom support
boom mounting bracket
using a U-bolt
(loop
forward) and two lock nuts
. Install the U-bolts at
the lower position
Refer to Figure 28
80. Select the four boom assemblies
have a specific assembly part number.
81. If the booms do not have end caps
Qty
Call
Part
Description
12
407-253D FERT BOOM MOUNTING BRACKET
24
24
803-177C NUT HEX FLG TP LK 5/16-18ZNYCR
Qty
Call
Part
Description
12
407-252D HI-RATE CENTER BOOM SUPPORT
12
806-152C U-BOLT 1/4-20 X 1.125 X 2 RND
24
803-088C NUT HEX LOCK 1/4-20 FLG
Qty
Call
Part
Description
4
Figure 27
High Rate Boom Mount
27100
1
U
D
F
B
L
R
2
3
4
6
5
1
3
4
6
Figure 28
High Rate Boom Assembly
27099
1
2
3
1