Great Plains NTA3010 Predelivery Manual User Manual
Page 2

160-220M
11/06/2008
Table of Contents
©
Copyright 1997, 1998, 2002, 2004, 2006, 2008. All rights Reserved.
Great Plains Manufacturing, Inc. provides this publication “as is” without warranty of any kind, either expressed or implied. While every precaution has been taken in the preparation
of this manual, Great Plains Manufacturing, Inc. assumes no responsibility for errors or omissions. Neither is any liability assumed for damages resulting from the use of the infor-
mation contained herein. Great Plains Manufacturing, Inc. reserves the right to revise and improve its products as it sees fit. This publication describes the state of this product at
the time of its publication, and may not reflect the product in the future.
Great Plains Manufacturing, Incorporated Trademarks
The following are trademarks of Great Plains Mfg., Inc.: Application Systems, Ausherman, Land Pride, Great Plains
All other brands and product names are trademarks or registered trademarks of their respective holders.
Printed in the United States of America.
NTA3010, NTA3510 and ADC
Great Plains Manufacturing, Inc.
Important Safety Information.................................... 1
Introduction ................................................................ 4
Implements Covered.................................................... 4
Assembly and Setup Assistance.................................. 5
Air Cart Pre-Delivery.................................................. 6
Air Cart Preparation ..................................................... 6
ADC2350 Pre-Delivery................................................. 6
Cart Assembly Summary ......................................... 6
Tools Required......................................................... 6
ADC2350 Cart Pre-Assembly Checklist................... 6
Unload Air Cart ........................................................ 7
Lift Air Cart on Truck .....................................................7
Locate Parts................................................................. 7
Install Wheels............................................................... 8
Cart Closeout ............................................................... 8
Install Cab Components............................................... 8
Air Drill Assembly ...................................................... 9
Drill Preparation ........................................................... 9
Drill Assembly Summary ...............................................9
Tools Required............................................................. 9
Drill Pre-Assembly Checklist........................................ 9
Assembly Area........................................................... 10
Locate Parts............................................................... 10
Unload Truck.............................................................. 10
Drill Assembly ............................................................ 11
Wing to Frame ............................................................11
Rockshaft to Frame.....................................................11
Gauge Wheel Arms to Wings......................................12
Mount Rockshaft Wheels ............................................13
Mount Front Gauge Wheels ........................................13
Assemble Lift-Assist-Wheel Arms ...............................14
Un-Stow Arms .............................................................14
Mount Wheels on Casters ...........................................14
Install Casters in Arms.................................................15
Install Lift Hydraulics ...................................................16
Install Wing Gauge Wheel Cylinders ...........................16
Install Lift-Assist Cylinders...........................................17
Route Hydraulic Hoses ...............................................18
Make Electrical Connections ..................................... 20
Make Hydraulic Connections ..................................... 21
Charging Hydraulics .................................................. 22
Charging Lift Hydraulics ............................................. 22
Install Transport Locks ................................................23
Charging Fold Hydraulics ........................................... 24
Verify Drill Fold ............................................................25
Level Frame............................................................... 25
Level Frame Side to Side ........................................... 25
Check Center Height ...................................................25
Check Wing Height......................................................25
Adjust Wing Height ......................................................26
Front to Back Level..................................................... 26
Install Distribution Towers ......................................... 27
Tower Positioning ....................................................... 27
Install Primary Seed Hoses ....................................... 29
Install Secondary Seed Hoses .................................. 30
NTA-3010 Port Assignments, 10in (25.4cm) Drill........32
NTA-3010 Port Assignments, 7.5in (19.2cm) Drill.......33
NTA-3510 Port Assignments, 10in (25.4cm) Drill........34
NTA-3510 Port Assignments, 7.5in (25.4cm) Drill.......35
Install Lift Switch (ADC2350 Only) ............................. 36
Install Press Wheels ................................................... 37
Install Options ............................................................. 37
Appendix .................................................................. 38
Torque Chart ............................................................. 38
Parts Lists.................................................................. 39
Drill Parts ............................................................... 39
Abbreviations............................................................. 41