Field operations, Final field checklist, Planting sequence – Great Plains 3S-4010HDF Operator Manual User Manual
Page 38: Final field checklist planting sequence, Efield operations
![background image](/manuals/598688/38/background.png)
34
3S-4010HD and 3S-4010HDF
Great Plains Manufacturing, Inc.
196-522M
03/28/2012
E
Field Operations
This section presumes that all pre-operation check have
been made on the drill, and the drill is loaded with seed
and (optionally) fertilizer.
Final Field Checklist
Planting Sequence
1.
Set Master and all section clutch switches ON.
2.
Lower drill at initial seeding point.
3.
Extend marker for next pass centerline.
4.
Pull forward and begin planting.
5.
Raise drill for turns (seed flow stops automatically).
6.
Retract marker and make turn.
Machine Damage Risk:
Do not make short radius turns with the drill in the ground.
❑ Drill unfolded (page 22).
❑ Lock-Out hubs: drive system engaged (page 22).
❑ Seed and fertilizer loaded (page 25).
❑ Set material rates per chart or calibration (page 43).
❑ Check all seed hoses secure.
FigureSpacer:
.eps
100%
Figure 38
3S-4010HD Planting
29077