AR/GE/FE/U 80/80X Installation Manual 

580­00519 rev. D 

2  Site Planning 

2.1  General 

Before the start of any installation, a survey  of the planned deployment site should be conducted 
first. The surveying personnel should be fully familiar with the details and requirements needed to 
successfully install the 80GHz radio system. 

2.2  Equipment Checklist 

We suggest the site survey team may need the following equipment:

·  Binoculars (not always required)

·  WAAS­capable GPS location device

·  Tape measure to determine distances for cable runs to ingress points

·  Digital camera (not always required)

·  Site survey report form to document and help assess site

·  Signaling mirror (provided but not always required)

·  70­90GHz Link Registration Datasheet. Contact BridgeWave Tech Support to learn where 

one can obtain the latest version of this form. You may E­mail [email protected] for 
this request or request it on­line via eService Center http://bridgewave.com/support. 

2.3  Line of Sight (LOS) 

The 80GHz Wireless Gigabit Ethernet link requires LOS for proper operation.  Binoculars and 
spotting mirrors may be used to assist in  the confirmation of LOS. 
Path planning should include an investigation into future building plans that could block the LOS 
path, and other long­term incremental obstructions such as tree growth. Intermittent obstructions 
such as aircraft at a nearby airport should also be considered.