beautypg.com

Figure 45, Components of the inlet valve and outlet valve – Metrohm 850 Professional IC Anion MCS Prep 2 User Manual

Page 94

background image

4.5 High pressure pump

■■■■■■■■■■■■■■■■■■■■■■

84

■■■■■■■■

850 Professional IC – Anion – MCS – Prep 2

1

2

3

5

6

7

8

9

10

9

8

7

10

5

4

6

Figure 45

Components of the inlet valve and outlet valve

1

Inlet valve 6.2824.170

2

Outlet valve 6.2824.160

3

Inlet valve housing

4

Outlet valve housing

5

Sealing ring (black)

6

Sleeve

7

Sapphire sleeve
The shiny side must point to ruby ball.

8

Ruby ball

9

Ceramic holder for ruby ball

10 Seal

The larger opening must point outwards.

4 Clean the components of the valve

Rinse the valve components with ultra pure water and/or acetone
and dry with a lint-free cloth.

5 Reassemble the valve

Reassemble valve components according to figure 45, page 84.

Insert the seal with the larger opening faced downwards into the
recess of the tool.

Lay the other valve components above another in the correct
sequence (see Figure 45, page 84).