beautypg.com

Metrohm 850 Professional IC Anion MCS Prep 2 User Manual

Page 24

background image

2.3 Flow diagram

■■■■■■■■■■■■■■■■■■■■■■

14

■■■■■■■■

850 Professional IC – Anion – MCS – Prep 2

Procedure:

1 Sample measurement

The sample is rinsed for a defined time period onto the preconcen-
tration column (3-15) at the injection valve (3-7) and retained there.
Then the injection valve (3-7)
is switched to and data
recording is started. The eluent carries along the sample retained on
the preconcentration column (3-15) to the separation column.

2 1. Standard addition

Note

The sample path should be rinsed between measurements.

Analogous to Step 1, but an additional defined amount of standard
solution is rinsed onto the preconcentration column (3-15) at the
injection valve (3-7) after the sample. The amount of standard solu-
tion is measured at the additional injection valve (3-14) and injected
into the sample path (one injection corresponds to calibration level
1).

3 2. Standard addition

Similar to Step 2, but with twice the amount of standard solution
(two injections correspond to calibration level 2).

4 X. Standard addition

Carry out the amount of standard additions required.