4 setting up the instrument, 1 packaging, 2 checks – Metrohm 850 Professional IC Anion MCS Prep 2 User Manual
Page 27: 3 location, 5 capillary connections in the ic system, Setting up the instrument, Packaging, Checks, Location, Capillary connections in the ic system
■■■■■■■■■■■■■■■■■■■■■■
2 Installation
850 Professional IC – Anion – MCS – Prep 2
■■■■■■■■
17
2.4
Setting up the instrument
2.4.1
Packaging
The instrument is supplied in highly protective special packaging together
with the separately packed accessories. Keep this packaging, as only this
ensures safe transportation of the instrument.
2.4.2
Checks
Immediately after receipt, check whether the shipment has arrived com-
plete and without damage by comparing it with the delivery note.
2.4.3
Location
The instrument has been developed for operation indoors and may not be
used in explosive environments.
Place the instrument in a location of the laboratory which is suitable for
operation, free of vibrations, protected from corrosive atmosphere, and
contamination by chemicals.
The instrument should be protected against excessive temperature fluctu-
ations and direct sunlight.
2.5
Capillary connections in the IC system
This chapter contains general information concerning the capillary con-
nections in the IC instruments.
Generally speaking, capillary connections between two components of an
IC instrument are made up of one connection capillary and two pressure
screws with which the capillary is connected to the respective compo-
nents.