beautypg.com

Rockwell Automation 1757-FFLD Linking Device Configuration Manual User Manual

Page 79

background image

Publication 1757-PM002A-EN-E - June 2006

Applications 4-25

Create and Schedule a Routine

1. Right-click Loop and select New Routine.

The New Routine window opens.

2. Enter >Pressure Loop< for the Name.

3. Select Function Block Diagram for the Type.

4. Click OK.

Pressure Loop is added to the Program.

5. Right-click Loop and select Properties.

6. On the Configuration tab, select Pressure Loop for the Main Routine.

7. Click Apply, then click OK.

Pressure Loop is designated the Main Routine.