Figure 96: Optional Front Installed.
Figure 97: Location on unit to install Full Screen or Screen.
Figure 98: Line up Tabs with slot on Unit
Figure 99: Optional Front Installed.
Both the full screen door and screen both install onto the front of the
unit using two(2) tabs, one on each side. These tabs secure the front
to the fireplace, allowing for easy removal for service access.
Install the front by lifting it parallel to the fireplace with the mounting
bracket tabs pointing towards the fireplace. Slide the tabs all the way
into the slots between the Glass Door Frame and the drywall flanges
of the fireplace. Pull down on each corner to make sure the tab is
engaged with the hanger.
IMPORTANT:
Ensure that the minimum gap required between the
Optional Front and wall of the unit is maintained (refer to Figure 99).
Not maintaining the proper gap will cause the unit to run at elevated
temperatures and result in an unsafe condition
The face should be cleaned before the fireplace is turned on for the
first time.