Operational Overview

MTS Series 793 Controller Overview

Operation Concepts

43

Chapter 4

Operation Concepts

This section provides conceptual information about using 793 Software
components to perform specific test activities.

Operational Overview

The following pages provide a high-level overview of the steps required to set
up, design, and run a test.

Setting Up A Project

To start a testing session, you create (or select) a place to keep the files you will
be generating while testing, such as test design files and test data files. This place
is referred to as a “Project.”

Project
Manager
application

Project 1

Project 2

Project 3

Creating a Station Configuration

Next, you use the Station Builder application to allocate resources from your
Hardware interface file to create individual Station Configuration files.

Station
Builder
application

Hardware
Interface
file

Station Config
file 1

Station
Config file 2

Station
Config file 3

hwi