VERTICAL SEAM
44
SSr r
Idge
/h
Ip
o
ver
o
pen
f
ramIng
1. Once panels have been installed, slide Back-Up Channel under upper edge of panels. Position Back-Up Channel to allow for
proper installation of Ridge/Hip assembly. Use C-clamps to hold Back-Up Channel in place.
2. Apply a row of Double Bead Tape Sealant across panel, up and over all ribs approximately 2” from panel end on both sides
of Ridge/Hip.
3. Install Vertical Seam Z-Closures over Double Bead Tape Sealant. Before continuing make sure Z-Closure placement will
accommodate SSR Ridge Cover (see page 47 for Z-Closure installation).
4. Once Z-Closure is set in Double Bead Tape Sealant, fasten through Z-Closure, tape sealant, Vertical Seam panel, and into
Back-Up Channel with (4) #10-16 x 1” PHD per panel. C-clamps may be removed once closures have been fastened.
5. Once all Z-Closures have been installed, place a row of Double Bead Tape Sealant across top of the Z-Closure on both sides
of the Ridge/Hip. Tube sealant must be used to fill any and all gaps left around the Z-Closures.
6. Install SSR Ridge Cover and secure to top leg of Z-Closure with Pop Rivets as shown above.
9. If two or more flashings are required, lap the flashing over the previously installed flashing by a minimum of 2” placing a
bead of Tube Sealant between the flashings and securing with pop rivets 2
1
/
2
”o.c.
Double Bead Tape Sealant
1
/
8
" x
3
/
16
" Pop Rivet (see below)
Vertical Seam Panel
Double Bead Tape Sealant
Vertical Seam Clip
Vertical Seam Z-Closure
#10-16 x 1" PHD (4 per panel)
Tube Sealant
SSR Ridge/Hip Cover
Back-up Channel
3:12 Slope
Minimum
INSTALLATION NOTES
Pop Rivet
Flashing
Z-Closure
Tape Sealant
CL