Vertical seam – Metal Sales Vertical Seam Installation User Manual
Page 22

800.406.7387 • www.metalsales.us.com
© Metal Sales Manufacturing Corporation Subject to change without notice Effective Date 5/13
VERTICAL SEAM
22
Cleat
#10-12 x 1" PHW (1'-0" o.c.)
Tube Sealant
Offset Cleat
Double Bead Tape Sealant
Vertical Seam Panel
#10-12 x 1" PHW (1'-0" o.c.)
Vertical Seam Clip
e
ave
wIth
o
ffSet
o
ver
d
eckIng
Moisture Barrier (by others)
Eave
All Eave flashings must be installed prior to panel installation.
1. Position and install Cleat to wall with appropriate fastener, 1'-0" o.c. Make sure Cleat allows for proper Eave attachment.
2. Install Eave flashing by sliding open hem onto Cleat and resting the Eave flashing against the substrate and fasten with
#10-12 x 1" Pancake Head Woodscrew (4'-0" o.c.) to hold the Eave Flashing in place during installation.
3. Apply a row of Double Bead Tape Sealant on the bottom leg of the Offset Cleat and fasten to substrate with #10-12 x 1"
Pancake Head Woodscrew through top of Eave flashing and into substrate, 1'-0" o.c. Make sure Offset Cleat is lined up
to properly accommodate hemmed panel.
4. Install panel by engaging field hemmed end of panel (see page 18) to Offset Cleat (See pages 20- 21 for panel installation).
5. If two or more flashings are required, lap the flashing over the previously installed flashing by a minimum of 2" placing a bead
of Tube Sealant between the flashings and securing with pop rivets 2.
1
/
2
" o.c.
Note:
Panel rib must be field
notched and flat part
of panel must be field
bent to accept Offset
Cleat (see page 18).
INSTALLATION NOTES
1:12 Slope
Minimum
over Solid
Substrate