Vertical seam – Metal Sales Vertical Seam Installation User Manual
Page 19
800.406.7387 • www.metalsales.us.com
© Metal Sales Manufacturing Corporation Subject to change without notice Effective Date 5/13
19
VERTICAL SEAM
I
nStallatIon
p
rocedure
o
vervIew
The following procedures (pages 20-46) are presented as a general guide for installing Vertical Seam panels, flashings, and acces-
sories on a typical building or residence. Details are shown for installing Vertical Seam and related flashings over solid decking
and over open framing. For other applications please contact Metal Sales.
The installation procedures will involve:
1. Panel installation from left to right (looking from eave to peak).
2. Panel clip installation.
3. Eave condition installation.
4. Extended Eave condition installation.
5. Box Gutter condition installation.
6. Valley condition installation.
7. Rake condition installation.
8. Rakewall condition installation.
9. Ridge condition installation.
10. Vented Ridge condition installation.
11. Peak condition installation.
12. Highside Parapet condition installation.
Box Gutter
(see pages 24,38)
Rake
(see pages 26,27,42,43)
Ridge
(see pages 30,31,44,45)