Endwall with reglet detail – Metal Sales Image II Installation User Manual
Page 30
© Metal Sales Manufacturing Corporation / Subject to change without notice, effective 6/2011
30
1. Once panels have been installed, field cut the 1" Z-Closure (See
page 30) to fit between the panel ribs.
2. Place a row of Double Bead Tape Sealant across panel
and over each panel rib approximately 2" from panel end.
Before proceeding make sure 1" Z-Closure placement will
accommodate Pitch Break flashing.
3. Install field cut 1" Z-Closure as shown on page 33.
4. Fasten 1" Z-Closure through panel with #8-18 x
3
/
4
" Truss
Head Woodscrews, 4 per panel.
5. Apply a continuous bead of Tube Sealant across top leg of
1" Z-Closure filling any gaps or openings around panel ribs.
Position and install Pitch Break flashing to 1" Z-Closure with
Pop Rivets, 3 per panel.
6. Fasten vertical leg of Pitch Break to the parapet wall with the
appropriate fastener, 1' o.c.
7. Install Reglet in field cut groove in the parapet wall. Seal
Reglet to parapet wall with Tube Sealant.
8. If two or more flashings are required, lap the flashing over
the previously installed flashing by a minimum of 2" placing a
bead of Tube Sealant between the flashings and securing with
Pop Rivets, 2" o.c.
Endwall With Reglet Detail
Optional Endwall
with Foam Closure
(X) Numbers indicate sequence of installation.
Image II Panel (1)
Moisture Barrier
Tube Sealant (10)
Fasteners By Others (8)
Pitch Break (6)
Reglet Flashing (9)
Pop Rivet, 3 per panel (7)
Double Bead Tape Sealant (4)
1" Z-Closure (2)
Tube Sealant (5)
Truss Head Woodscrew (3)
Pop Rivet
Double Bead Tape Sealant
Truss Head
Woodscrew