Panel installation – Metal Sales Image II Installation User Manual
Page 21
© Metal Sales Manufacturing Corporation / Subject to change without notice, effective 6/2011
21
Panel Installation
Step 1 (cont)
Concealed Fastened Panel Installation
Installing First Panel
Square panel
at Rake (6)
Position panel
at Eave (6)
Double Bead Tape Sealant
Truss Head
Woodscrew (8)
6. Install first panel so that eave has proper overhang making
sure that the panel is square to eave and rake. Slide the panel
toward the peak of the roof engaging the panel with the Offset
Cleat. Offset Cleat must be fully engaged into the panel.
Additional overhang must be considered if using wall panels.
It is critical that the first panel be straight and square with the
building as it controls alignment of the following roof panels.
7. Fasten panel to substrate with a #8-18 x
3
/
4
" Truss Head
Woodscrew in the center of the fastening groove located along
the male leg of the panel. Fastener spacing must be designed to
meet local building codes. (It is important that the fastener be
placed in the center of the fastening groove and make sure not
to over-tighten screws.)
(X) Numbers indicate sequence of installation.