Post-hung gutter detail – Metal Sales Image II Installation User Manual
Page 24
![background image](/manuals/567686/24/background.png)
© Metal Sales Manufacturing Corporation / Subject to change without notice, effective 6/2011
24
Post-Hung Gutter Detail
Optional Gutter
with offset cleat
All Eave flashings must be installed prior to panel installation.
1. Install Eave flashing by resting the flashing against the
substrate and fasten with #8-18 x
3
/
4
" Truss Head Woodscrews,
4' o.c. to hold the Eave flashing in place during installation.
2. Apply a row of Double Bead Tape Sealant on the top leg of the
Eave flashing.
3. Install first panel so that the panel end has proper overhang
making sure that panel is square to eave and rake.
4. Fasten substrate with a #8-18 x
3
/
4
" Truss Head Woodscrew in
the center of the fastening groove located along the male leg
of the panel. Fastener spacing must be designed to meet local
building codes.
5. Fasten Image II panel with (4) #9-16 x 1" Woodscrews through
Double Bead Tape Sealant, flashing, and into the solid sub-
strate.
6. Slide the Gutter flashing behind Eave Flashing and fasten
through Fascia Bracket and Flashing into the substrate. Pop
Rivet the Gutter flashing to Fascia Bracket.
Note: If two or more flashings are required, lap the flashing over the
previously installed flashing by a minimum of 2" placing a bead of
Tube Sealant between the flashings and securing with Pop Rivets,
2" o.c.
(X) Numbers indicate sequence of installation.
Image II Panel (4)
Moisture Barrier
Gutter Flashing (By Others) (6)
#9-16 x 1" Woodscrew (5)
Eave (1)
Double Bead Tape Sealant (3)
Truss Head Woodscrew,
4' o.c. (2)