Rakewall with reglet detail – Metal Sales Image II Installation User Manual
Page 28

© Metal Sales Manufacturing Corporation / Subject to change without notice, effective 6/2011
28
Image II Panel (1)
Moisture Barrier
Tube Sealant (7)
Fasteners By Others (5)
Step Rakewall (3)
Reglet Flashing (6)
Tape Sealant (2)
#9-16 x 1" Woodscrew,
1' o.c. (4)
Rakewall with Reglet Detail
1. Roof panel must be installed before Rakewall flashing.
2. If the panel ends off module, bend flat part of the panel up a
minimum of 1", otherwise skip to the next note.
3. Apply a row of Double Bead Tape Sealant to the flat part of the
panel next to the panel rib or vertical field bent leg.
4. Install Rakewall to the and attach with #9-16 x 1" Woodscrews,
1' o.c. to the flat pan of the Image II Panel.
5. Install Reglet in field cut groove in the parapet wall. Seal
Reglet to parapet wall with Tube Sealant.
6. If two or more flashings are required, lap the flashing over
the previously installed flashing by a minimum of 2" placing a
bead of Tube Sealant between the flashings and securing with
Pop Rivets, 2" o.c.
Optional Rakewall
With 1" Z-Closure
(X) Numbers indicate sequence of installation.