beautypg.com

Bryant Deluxe 4 WAy Gas Furnase 355MAV User Manual

Page 59

background image

CHECKLIST—INSTALLATION
Load Calculation

Condensate Drain

_______

_______

_______

Heating Load (Btuh)

Cooling Load (Btuh)

Furnace Model Selection

_______

_______

_______

_______

_______

Unit Level or Pitched Forward

Internal Tubing Connections Freeof Kinks and Traps

External Drain Connection Leak tight and Sloped

Condensate Trap Primed before Start-Up

Heat Tape Installed if Required

COMBUSTION AND VENT PIPING

Terminal Location

CHECKLIST—START-UP

_______

_______

______

______

______

______

______

______

Roof or Sidewall

Termination Kit — 2 Pipe or Concentric

Combustion-Air Pipe Length

Combustion-Air Elbow Quantity

Vent Pipe Elbow Quantity

Pipe Diameter Determined from

Sizing Table

Pipe Sloped to Furnace

______

______

Gas Input Rate(Set Within 2 percent of RatingPlate)

Temperature Rise Adjusted

Pipe Insulation

Thermostat Anticipator

______

______

Over Ceilings

Low-Ambient Exposed Pipes

______

______

Anticipator Setting Adjusted or

Cycle Rate (3 Cycles per Hr)Selected

Safety Controls Check Operaton
______

______

Primary Limit

Pressure Switch

—59—