beautypg.com

Bryant Deluxe 4 WAy Gas Furnase 355MAV User Manual

Page 43

background image

1. Fold heat tape in half and wrap on itself 3 times.
2. Locate heat tape between sides of condensate trap back. (See Fig. 50.)
3. Use wire ties to secure heat tape in place. Wire ties can be positioned in notches of condensate trap sides. (See Fig. 50.)
4. Wrap field drain pipe with remaining heat tape, approximately 1 wrap per ft.
5. When using field-supplied heat tape, follow heat tape manufacture’s instructions for all other installation guidelines.

SEQUENCE OF OPERATION

CAUTION: Furnace control must be grounded for proper operation, or control will lock out. Control is grounded

through green wire routed to gas valve and burner box screw.

Using schematic diagram (see Fig. 30.), follow sequence of operation through different modes. This furnace has a new control system. Read and

follow wiring diagra, carefully.
NOTE: If 115-v power supply to furnace or blower access panel switch is interrupted during a call for heat, blower operates at low-heat speed

for 60 sec when power is restored before heating cycle is resumed.

Fig. 49—Example of Field Drain Attachment

A94054

OPEN STAND

PIPE FOR

A/C OR

HUMIDIFIER

DRAIN

TEE

TO OPEN

DRAIN

Fig. 50—Condensate Trap Heat Tape

A93036

CONDENSATE TRAP

WIRE TIE(S)

HEAT TAPE

(3 WRAPS MINIMUM)

—43—