beautypg.com

Ul9010 ultra-lok, Tool, Clamp application preformed clamps – BAND-IT UL9010 Ultra-Lok Tool User Manual

Page 11

background image

BAND-IT-IDEX, Inc.
A Unit of IDEX Corporation
4799 Dahlia Street
Denver, CO 80216-0307 USA
Ph: 1-800-525-0758
Fax: 1-800-624-3925

Document # P44987 Rev. N

© Copyright

BAND-IT-IDEX, Inc. 2011

All rights reserved

www.BAND-IT-IDEX.com

Page 11 of 14

UL9010

Ultra-Lok

Tool

Clamp Application
Preformed Clamps

Place clamp in desired position on object to be clamped.
Follow steps 5 and 6 on page 9.
Inspect lock in buckle on completed clamp, and then tap down buckle shroud as shown below.








































When applying clamps on soft, thick-walled hose, tension clamp then wait a full 30
seconds. Clamps may be retensioned by squeezing the actuator switch on the power
unit a second time prior to forming the lock and cutting the excess clamp tail. This
allows hose to “settle” under the band of the clamp. This hose material attribute is
called Cold Flow. Finally, complete clamp by tapping down the buckle shroud as
described above.

Important: Visually inspect lock formed in band as shown. If lock has slipped under the sheared surface of the
buckle, remove clamp and install a new clamp at reduced tension by lowering the drill clutch torque setting.

Front View

Completed Clamp

(Visually inspect lock)

Buckle Shroud

Lock sheared in center and
formed inside shroud

SIDE VIEW

Completed UL Pre-

formed Clamp with

buckle shroud tapped

down as required

Tap down buckle
shroud to complete
clamp

Shear Surface

Section View
Proper Clamp

formation

Section View

Improper lock

formation

Lock has slipped back
under sheared buckle
surface