Ul9010 ultra-lok, Tool, Clamp application preformed clamps – BAND-IT UL9010 Ultra-Lok Tool User Manual
Page 11
BAND-IT-IDEX, Inc.
A Unit of IDEX Corporation
4799 Dahlia Street
Denver, CO 80216-0307 USA
Ph: 1-800-525-0758
Fax: 1-800-624-3925
Document # P44987 Rev. N
© Copyright
BAND-IT-IDEX, Inc. 2011
All rights reserved
www.BAND-IT-IDEX.com
Page 11 of 14
UL9010
Ultra-Lok
Tool
Clamp Application
Preformed Clamps
Place clamp in desired position on object to be clamped.
Follow steps 5 and 6 on page 9.
Inspect lock in buckle on completed clamp, and then tap down buckle shroud as shown below.
When applying clamps on soft, thick-walled hose, tension clamp then wait a full 30
seconds. Clamps may be retensioned by squeezing the actuator switch on the power
unit a second time prior to forming the lock and cutting the excess clamp tail. This
allows hose to “settle” under the band of the clamp. This hose material attribute is
called Cold Flow. Finally, complete clamp by tapping down the buckle shroud as
described above.
Important: Visually inspect lock formed in band as shown. If lock has slipped under the sheared surface of the
buckle, remove clamp and install a new clamp at reduced tension by lowering the drill clutch torque setting.
Front View
Completed Clamp
(Visually inspect lock)
Buckle Shroud
Lock sheared in center and
formed inside shroud
SIDE VIEW
Completed UL Pre-
formed Clamp with
buckle shroud tapped
down as required
Tap down buckle
shroud to complete
clamp
Shear Surface
Section View
Proper Clamp
formation
Section View
Improper lock
formation
Lock has slipped back
under sheared buckle
surface