It3000-ab, Maintenance, Preventative maintenance schedule – BAND-IT IT3000-AB 1/4 Ultra-Lok Tool User Manual
Page 21: 21 of 28, 1/4” ultra-lok tool
Document # I17793 Rev D
© Copyright
BAND-IT-IDEX, Inc. 2009
All rights reserved
www.BAND-IT-IDEX.com
BAND-IT-IDEX, Inc.
A Unit of IDEX Corporation
4799 Dahlia Street Denver, CO 80216-0307 USA
P: 1-800-525-0758 F: 1-800-624-3925
21 of 28
IT3000-AB
1/4” Ultra-Lok Tool
Preventative Maintenance Schedule
Clamps
Installed
Maintenance
Item
Maintenance
Action
Every 12,500
Tension Block Assembly
Clean & Re-Lubricate
Flip Cover
Clean & Re-Lubricate
Every 25,000
Mechanical Linkage
Clean & Re-Lubricate
Tool Head
Clean & Re-Lubricate
Cut-off Blade
Replace
Cut-off Knife
Replace
Front Gripper
Clean & Re-Lubricate
Every 50,000
Blade, Blade pin, Knife
and Knife pin
Replace
Tension Block Assembly
Replace Assembly
Front Gripper
Replace Gripper
Tool Preventative Maintenance:
The tool has some wear components that must be checked and replaced on a certain
schedule. BAND-IT has developed a Preventative Maintenance (PM) schedule to help
facilitate these requirements. If tools are experiencing difficulties during function or there
audible air leaks coming from inside the handle, the tool should be returned to BAND-IT-
IDEX, Inc. for servicing.
BAND-IT recommends that the tool be sent in for general overhaul every 100,000 clamps
installed.
Maintenance