JLG 1100SB Service Manual User Manual
Service and maintenance manual, Models 1100sb
Table of contents
Document Outline
- Section A. INTRODUCTION - MAINTENANCE SAFETY PRECAUTIONS
- Section 1. SPECIFICATIONS
- Section 2. GENERAL
- Section 3. CHASSIS & TURNTABLE
- 3.1 Tires & Wheels
- 3.2 Extending Axles
- 3.3 Axle Limit Switch Adjustment Procedure
- 3.4 Drive System
- 3.5 Steering Control System
- 3.6 Drive/Steering Speed Control
- 3.7 Traction Control System
- 3.8 Drive Orientation System
- 3.9 Oscillating Axle System
- 3.10 Oscillating Axle Bleeding Procedure and Lockout Test
- 3.11 Drive Hub - Bonfiglioli
- Product Identification
- Hydraulic Motor Installation
- Installation of the Wheel Drive on the Machine
- Start Up and Running In
- General Information
- Connecting the Brake
- Filling-up the Gearbox with Lubricating Oil
- Gearbox Disengagement
- Maintenance Information
- Changing the Lubricating oil
- Troubleshooting
- Disassembly Information
- Disassembly Procedure
- Inspection of Parts
- Assembly
- Final Test and Reinstallation
- 3.12 Drive Hub - Reggiana Riduttori
- 3.13 Swing Drive
- 3.14 Swing Brake
- 3.15 Swing Motor
- 3.16 Procedure For Setting Gear Backlash
- 3.17 Swing Drive Lubrication
- 3.18 Swing Bearing
- 3.19 Swing Speed Proportioning
- 3.20 Chassis Tilt Indicator System
- 3.21 Rotary Coupling
- 3.22 Generator
- 3.23 Auxiliary Power System
- 3.24 Cold Weather Package
- 3.25 Engine
- 3.26 Deutz EMR 2
- 3.27 Bio Fuel in Deutz Engines
- Section 4. BOOM & PLATFORM
- 4.1 Boom Systems
- Broken Cable Indicator System
- Platform Control Enable System
- Transport Position Sensing System
- Beyond Transport - Drive Speed Cutback System
- Jib Stow System
- Envelope Tracking System
- Moment Control System
- Boom Control System (BCS) Functional Check (Push to Test) System
- Controlled Arc System
- Controlled Boom Angle System
- Envelope Tracking
- Slow Down System
- Dual Capacity System
- Electronic Platform Leveling
- Boom Control Select
- 4.2 Boom Assembly
- 4.3 Jib Rotator Orientation
- 4.4 Jib Lift End of Stroke Dampening
- 4.5 Load Sensing Pin Removal and Installation
- 4.6 Hose Routing Procedure
- 4.7 Wire Rope
- 4.8 Broken Boom Cable Proximity Switch
- 4.9 Electronic Platform Leveling
- 4.10 Rotary Actuator
- 4.1 Boom Systems
- Section 5. HYDRAULICS
- Section 6. JLG CONTROL SYSTEM
- 6.1 Introduction
- 6.2 CANbus Communications
- 6.3 Calibration Instructions
- 6.4 To Connect the JLG Control System Analyzer
- 6.5 Using the Analyzer
- 6.6 Changing the Access Level of the Hand Held Analyzer
- 6.7 Adjusting Parameters Using the Hand Held Analyzer
- 6.8 Machine Setup
- 6.9 Machine Personality Settings/ Function Speeds
- 6.10 Machine Orientation When Setting Function Speeds
- 6.11 System Test
- 6.12 Calibrating Steer
- 6.13 Calibrating Drive
- 6.14 Electronic Platform Leveling
- 6.15 Calibrating Platform Level
- 6.16 Calibrating Lift Crack Point
- 6.17 Calibrating Telescope Crack point
- 6.18 Calibrating Tilt Sensor
- 6.19 Calibrating the Boom Sensors
- 6.20 CANbus Troubleshooting
- Section 7. BASIC ELECTRICAL INFORMATION & SCHEMATICS