Installing the I-26/26R Stacking Kit
CAUTION!
If the shaker you will place on the bottom is already mounted on a 43.2 cm
(17 in) base, follow these instructions first:
To stack two shakers: (1) remove the 10.2 cm (4 in) high section of the base,
(2) remove the base mating supports, (3) move the corner braces from the
10.2 cm base to the 33.0 cm (13 in) base, (4) reinstall the shaker on the
33.0 cm base.
To stack three shakers: (1) remove the 33.0 cm (13 in) high section from the
bottom of the base, (2) remove the base mating supports.
1. Remove the six ½-inch plastic slotted set screws and the three ¼-inch plastic socket set
screws from the top of the shaker installed on the base.
Figure 7: Preparing to Stack Shakers
2. Using the six ½-13 x 1-inch hex head screws, lock washers, and washers provided,
attach the stacking kit stacking rails to the top sides of the unit installed on the base.
Secure the rails in place as shown in Figure 8.
3. Install the stacking stop bracket to the top back of the unit installed on the base, using
the three ¼-20 x 5/8-inch hex head screws, lock washers, and washers provided, as
shown in Figure 8 on the following page.