beautypg.com

Eppendorf I-26R Large Stackable Incubator Shakers User Manual

Page 18

background image

18

I-26/26R Incubator Shakers M1324-0050

Operating Manual

Figure 5: Mounting Corner Braces














With the corner braces securely in place, the shaker mounted on its base will look like
this:

Figure 6: Shaker Installed on Base

6. Make sure the shaker is level; add metal shims under the base as needed to level the

unit.

7. Fully load the shaker and do a test run at normal speed. Make additional leveling

adjustments if necessary.






This manual is related to the following products: