beautypg.com

Transportar la plataforma de trabajo, Por grúa, Por camión – Snorkel Bi-Energy-sn1879-4274 User Manual

Page 11: Paso 2 paso 5 paso 3 paso 6, Anillos de amarre para asegurar o levantar

background image

11

* Specifications subject to change without notice.
Refer to Service Manual for complete parts and service information.
Meets or exceeds all applicable requirements of OSHA and ANSI A92.6-1990

LX41

3.64 m x 1.78 m [143.38 in. x 70 in.]
4.56 m x 1.73 m [179.38 in. x 68 in.]

3.96 m x 1.73 m [156 in. x 68 in.]
5.79 m x 1.73 m [228 in. x 68 in.]

680

kg [1,500 lbs.]

680

kg [1,500 lbs.]

227 kg [500 lbs.]
567 kg [1,250 lbs]
227 kg [500 lbs.]

6 people
2 people
6 people
2 people

14.33 m [47 ft.]
12.34 m [40 ft. 6 in. ]
1.66 m [65.3 in. ]

2

WD

: 5,085 kg [11,210 lbs.]

4

WD

: 5,176 kg [11,410 lbs.]

2

WD

: 5,280 kg [11,640 lbs.]

4

WD

: 5,371 kg [11,890 lbs.]

2

WD

: 5,474 kg [12,068 lbs.]

4

WD

: 5,565 kg [12,268 lbs.]

2.29 m [90 in.]
2.76 m [108.75 in.]
4.08 m [160.5 in.]

12.34 m [0 ft. 6 in.]

0 to 5.0 km/h [0 to 3.1 mph]
0 to .48 km/h [0 to 0.3 mph]

48 Volt DC

107.13 l [28.3 Gallons]

206.8 bar [3000 psi]

ISO #46

5W-20 Motor Oil

One Single Stage Lift Cylinder

Raise, 40 sec./Lower, 60 sec.

Eight 6V 350 AH Batteries
(BiEnergy) One Kubota 12 HP Diesel

Proportional

Smooth one hand Joystick

Two Electric Wheel Motors

10-16.5 NHS 8 Ply, 3.4 bar [50psi]
Poly Filled

Two, Spring Applied, Hydraulic Release,
Multiple Disc

1.22 m [48 in.]

2

WD

: 30% [16.7º]

2.94 m [115.75 in.]

1.1 m [43.5 in.] high, Fold Down with Self
Closing Gate

152 mm [6 in.] High

LX31

3.64 m x 1.78 m [143.38 in. x 70 in.]
4.56 m x 1.73 m [179.38 in. x 68 in.]

3.96 m x 1.73 m [156 in. x 68 in.]
5.79 m x 1.73 m [228 in. x 68 in.]

907 kg [2000 lbs.]
907 kg [2000 lbs.]
227 kg [500 lbs.]
795 kg [1750 lbs.]
227 kg [500 lbs.]

8 people
2 people
8 people
2 people

11.28 m [37 ft.]
9.45 m [31 ft.]
1.43 m [56.3 in.]

2

WD

: 4,477 kg [9,870 lbs.]

2

WD

: 4,568 kg [10,070 lbs.]

2

WD

: 4,672 kg [10,300 lbs.]

2

WD

: 4,763 kg [10,500 lbs.]

2

WD

: 4,866 kg [10,728 lbs.]

2

WD

: 4,957 kg [10,928 lbs.]

2.29 m [90 in.]
2.53 m [99.75 in.]
4.08 m [160.5 in.]

9.45 m [31 ft.]

0 to 5.0 km/h [0 to 3.1 mph]
0 to .48 km/h [0 to 0.3 mph]

48 Volt DC

107.13 l [28.3 Gallons]

206.8 bar [3000 psi]

ISO #46

5W-20 Motor Oil

One Single Stage Lift Cylinder

Raise, 40 sec./Lower, 60 sec.

Eight 6V 350 AH Batteries
(BiEnergy) One Kubota 12 HP Diesel

Proportional

Smooth one hand Joystick

Two Electric Wheel Motors

10-16.5 NHS 8 Ply, 3.4 bar [50psi]
Poly Filled

Two, Spring Applied, Hydraulic Release,
Multiple Disc

1.22 m [48 in.]

2

WD

: 30% [16.7º]

2.94 m [115.75 in.]

1.1 m [43.5 in.] high, Fold Down with Self
Closing Gate

152 mm [6 in.] High

ITEM

Platform Size (Inside Toeboards)
Standard

w/ Extension

Double Deck Models
w/ Decks Retracted
w/ Decks Extended

Max. Platform Capacity

Standard
w/ Extension
on Extension

Double Deck Models

on Extension (one end only)

Max. No. of occupants
Standard

on Extension

Double Deck Models

on Extension (one end only)

Height
Working Height

Max. Platform Height
Min. Platform Height

Dimensions
Weight,

Electric
BiEnergy
Electric w/ Extension
BiEnergy
Electric Double Deck
BiEnergy

Overall Width
Overall Height
Overall Length, Standard

Driveable Height

Surface Speed
Platform Lowered
Platform Raised

System Voltage

Hydraulic Tank Capacity

Maximum Hydraulic System Pressure

Hydraulic Fluid
Normal Use (> 0

°

C [32

°

F])

Low Temp. Use
(-23 to 0

°

C [-10 to 32

°

F])

Lift System

Lift Speed

Power Source

Drive Control

Control System

Horizontal Drive

Tires

Standard
Optional

Parking Brakes

Turning Radius (inside)

Maximum Gradeability

Wheel Base

Guardrails

Toeboard

38

Procedimiento de elevación para
modelos de doble cubierta

1.

Levante la baranda delantera y empújela hacia abajo
para asegurar la baranda en posición vertical. Repita
la operación para la baranda trasera.

2.

Levante las barandas laterales y empújelas hacia
abajo para asegurarlas en posición vertical, alínee
los orificios e instale los pernos, arandelas y
tuercas. Asegúrelos firmemente.

3.

Levante uno de los cuatro ensamblados de las
barandas laterales de la cubierta de deslizamiento.
Alinee los orificios e instale los elementos de
montaje. Asegúrelos firmemente. Repita este
proceso para las otras tres barandas laterales de la
cubierta de deslizamiento.

4. Cuelgue el contralor en la baranda delantera.

5. Antes de operar la plataforma de trabajo verifique que

los pernos estén en su lugar y apretados al par de
torsión correcto.

Figura 8: Transportando la plataforma de trabajo

paso 2

paso 5

paso 3

paso 6

Nota: La illustración de arriba muestra las cubiertas
extendidas con el propósito de clarificar. Realice
este procedimiento con las cubiertas retrídas.

Figura 7: Plegar la baranda (doble cubierta)

Anillos de amarre para asegurar o levantar

Transportar la plataforma

de trabajo

Por grúa

1. Asegure las correas sólo a los anillos de amarre o

levante (fig. 8).

Por camión

1. Mueva la plataforma de trabajo a la posición para

transporte y acuñe las ruedas.

2. Asegure la plataforma de trabajo al vehículo de

transporte con cadenas o correas, de resistencia
adecuada para la carga, desde los anillos de
amarre (fig. 8).

Sobreestirar cadenas o correas desde los
anillos puede dañar la plataforma de trabajo.

This manual is related to the following products: