Mantenimiento, Routine service, Mantenimiento de la batería – Snorkel Bi-Energy-sn1879-4274 User Manual
Page 10: Remoción, Routine service table key, Service report, Routine service table, Every year or 500 hours 2

10
Routine Service
Use the following table as a guide for routine mainte-
nance. Inspection and maintenance shall be
performed by personnel who are trained and familiar
with mechanical and electrical procedures. Refer to
the Service Manual for complete service instructions.
Please copy this page and use the Routine Service
Table as a checklist when inspecting a machine for
service.
Routine Service Table Key
Interval
Daily=each shift (every day) or every eight hours
30
D
=every month (30 days) or every 50 hours
3
M
=every 3 months or 125 hours
6
M
=every 6 months or 250 hours
1
Y
=every year or 500 hours
2
Y
=every 2 years or 1000 hours
Y=Yes/Acceptable
N=No/Not Acceptable
R=Repaired/Acceptable
Service Report
Date: ________________
Owner: _________________
Model No: ____________ Serial No: _____________
Serviced By: ____________
Service Interval: _________
Routine Service Table
COMPONENT INSPECTION OR SERVICES
INTERVAL Y N R
Elevating
Inspect for structural cracks
Daily
Assembly
Check pivot points for wear
30
D
Check pivot pin mounting bolts
30
D
for proper torque
Check scissor arms for bending
6
M
Grease scissor pins
30
D
Chassis
Check hoses for pinch or rubbing points
Daily
Check component mounting for proper torque
6
M
Check welds for cracks
Daily
Lift
Check the cylinder rod for wear
30
D
Cylinder
Check pivot pin mounting bolts for proper torque
30
D
Check seals for leaks
30
D
Inspect pivot points for wear
30
D
Check fittings for proper torque
30
D
Axle
Check the cylinder rod for wear
30
D
Cylinder
Check mounting pin pivot bolts for proper torque
30
D
Check seals for leaks
30
D
Inspect pivot points for wear
30
D
Check fittings for proper torque
30
D
Entire
Check for and repair collision damage
Daily
Unit
Check fasteners for proper torque
3
M
Check for corrosion-remove and repaint
6
M
Lubricate
30
D
Labels
Check for peeling, missing, or unreadable
Daily
labels & replace
COMPONENT INSPECTION OR SERVICES
INTERVAL Y N R
Engine Oil
Check level and condition
Daily
BiEnergy
Check for leaks
Daily
Models
Change oil & filter
100
HOURS
Engine Fuel
Check fuel level
Daily
System
Check for leaks
Daily
BiEnergy
Replace fuel filter
100
HOURS
Models
Check air cleaner
Daily
Main
Check electrolyte level
Daily
Battery
Check specific gravity
30
D
Pack
Clean exterior
6
M
Check battery cable condition
Daily
Clean terminals
6
M
Engine
Check electrolyte level
Daily
Battery
Check specific gravity
30
D
System
Clean exterior
6
M
BiEnergy
Check battery cable condition
Daily
Models
Clean terminals
6
M
Engine
Check coolant level (with engine cold)
Daily
Coolant
Replace coolant
2
Y
Hydraulic
Check oil level
Daily
Oil
Change filter
6
M
Drain and replace oil
2
Y
Hydraulic
Check for leaks
Daily
System
Check hose connections
30
D
Check hoses for exterior wear
30
D
Emergency
Open the emergency lowering valve and
Hydraulic
check for serviceability
Daily
System
Controller
Check switch operation
Daily
Control
Check the exterior of the cable
Daily
Cable
for pinching, binding or wear
Platform
Check fasteners for proper torque
Daily
Deck and
Check welds for cracks
Daily
Rails
Check condition of deck
Daily
Tires
Check for damage
Daily
Check air pressure 5.2 bars (75 psi)
Daily
Check lug nuts (torque to 205 Nm [150 ft. lbs.])
30
D
Hydraulic
Wipe clean
30
D
Pump
Check for leaks at mating surfaces
30
D
Check for hose fitting leaks
Daily
Check mounting bolts for proper torque
30
D
Drive Motors Check for operation and leaks
Daily
Steering
Check hardware & fittings
6
M
System
for proper torque
Oil all pivot points
30
D
Check steering cylinder for leaks &
30
D
mounting bolts for proper torque
39
Mantenimiento de la batería
Peligro de mezcla de gases explosiva. Mantenga
las baterías lejos de chispas, llamas o de
cigarrillos.
Cuando trabaje con baterías, use siempre
anteojos de seguridad.
Los electrólitos son muy corrosivos. Lave bien
los derrames con agua limpia.
Use siempre baterías UpRight de repuesto o
aquellas aprobadas por el fabricante como tales
y que pesen 54,4 kg (120 lb) c/u.
Inspeccione el nivel de electrólito diariamente,
especialmente si la plataforma de trabajo se usa en un
clima seco y cálido.
Si el electrólito está a menos de 10 mm (3/8 plg) del
tope de las placas agregue sólo agua destilada. NO use
agua potable con alto contenido de minerales para no
acortar la vida de la batería.
Mantenga los terminales y las baterías limpias.
Consulte en la Manual de mantenimiento como
incrementar la vida de la batería y las instrucciones
completas de mantenimiento.
Jamás mantenga el mecanismo de tijera de la
plataforma de trabajo con la plataforma
levantada sin haber bloqueado antes ese
mecanismo.
NO se pare en el área del mecanismo de tijera al
instalar o guardar el puntal.
Bloqueando el mecanismo de tijera
(figura 9)
Instalación
1. Estacione la plataforma de trabajo en piso horizontal
firme.
2. Verifique que el interruptor de paradas de
emergencia esté conectado “ON”.
3. Gire el conmutador plataforma/chasis a chasis
“CHASSIS”.
4. Eleve la plataforma lo más lejos posible para permitir
que la abrazadera baje.
5. Desde el lado izquierdo de la máquina, saque el
pasador de enganche que asegura el brazo. Gire el
brazo de las tijeras contra las manecillas del reloj
hasta que esté vertical y entre los dos pivotes de las
tijeras.
6. Baje la plataforma lentamente hasta que la
abrazadera sostenga la plataforma.
Remoción
1. Desde los controles del chasis levante la plataforma
hasta que el puntal de las tijeras salga de los dos
pivotes centrales.
2. Gire el puntal en el sentido de los punteros del reloj
hasta que el pasador de enganche encaje.
3. Baje completamente la plataforma.
Mantenimiento
Figura 9: Bloqueo del mecanismo de tijera
Pasador de
enganche
Pivote central de
tijera inferior
Puntal
Pivote central
de tijera
superior