Removing and installing p.c. board, Removing and installing quartz clock, Removing and installing frame for indicator lamps – BMW K 1100 LT/RS User Manual
Page 356: Removing and installing p.c. board for fuel gauge
62.8
Removing and installing p.c. board
•
Release securing screws and carefully lift out
p.c. board (1).
L
Note:
Do not damage p.c. board when removing and
installing.
Ensure plug contacts are fitted correctly.
Removing and installing quartz clock
•
Carefully remove frame (1) by pulling upwards.
•
Carefully press retaining hooks towards the out-
side in the sequence (2,3) and (4,5).
•
Remove quartz clock (6) by pulling upward.
•
Install in the reverse order of removal.
Removing and installing frame for indicator
lamps
•
Carefully press hooks (arrows) towards the out-
side.
•
Carefully lift out frame (7,8).
Removing and installing p.c. board for fuel
gauge
•
Release screws (1).
•
Lift out p.c. board (2).
L
Note:
Do not bend p.c. board while installing.
LT620050
1
LT620060
1
2
6
4
3
5
LT620070
7
8
LT620080
1
2