beautypg.com

Burnham V9A User Manual

Page 47

background image

47

d. Stop burner and drain boiler in a manner and to

a location that hot water can be discharged with

safety.

e. Refill boiler to normal water line. If water in

gauge glass does not appear to be clear, repeat

steps (a. thru e.), and boil out the boiler for a

longer time.

2. Low pressure steam boilers such as the V9A Series

should be maintained with appropriate water

treatment compounds. After cleaning process has

been completed, add water treatment compounds

as recommended by your local qualified water

treatment company.

3. Remove temporary surface blowoff piping and

replug tapping. Boil or bring water temperature to

180°F promptly in order to drive off the dissolved

gases in the fresh water.

4. If unsteady water line, foaming or priming persist,

install gate valve in Hartford Loop and drain valves

in return main and at boiler and proceed as follows:
a. Connect hoses from drain cocks to floor drain.

Close gate valve in Hartford Loop and open

drain valve in return main. Fill boiler to normal

water level, turn on burner and operate boiler

at this water level for at least 30 minutes after

the condensate begins to run hot, then turn off

burner.

Close all radiator valves. Remove all supply

main air valves and plug the openings in supply

main.

b. Draw about 5 gallons of hot water from boiler

into a container and dissolve into it appropriate

amount of a recommended boilout compound.

Remove surface blowoff plug and pour this

solution into boiler, then reinstall plug.

c. Turn on burner and keep operating while feeding

water to boiler slowly. This will raise water level

in boiler slowly so that water will be boiling hot

and will rise slowly into supply main and back

through return main, flowing from drain hose

at about 180°F. Continue until water runs clear

from drain hose for at least 30 minutes.

d. Stop feeding water to boiler but continue

operating burner until excess water in boiler

flows out through supply main and water lowers

(by steaming) until it reaches normal level in

boiler. Turn off burner. Drain boiler. Open all

radiator valves. Reinstall all supply main air

valves. Open gate valve in Hartford Loop.

e. When boiler has cooled down sufficiently (crown

sheet of sections are not too hot to touch), close

the drain cocks at boiler and in return main and

feed water slowly up to normal level in boiler.

Turn on burner and allow boiler to steam for

10 minutes then turn off burner. Draw off one

quart of water from bottom gauge glass fitting

and discard. Draw off another quart sample and

if this sample is not clear, repeat the cycle of

draining the boiler and return main and refilling

the boiler until sample is clear.

f. If the boiler water becomes dirty again at a later

date due to additional sediment loosened up in

the piping, close gate valve in Hartford Loop,

open drain valve in return main, turn on burner

and allow condensate to flow to drain until it has

run clear for at least 30 minutes while feeding

water to boiler so as to maintain normal water

level. Turn off burner, drain boiler, open gate

valve in Hartford Loop, then repeat step (1)

above.

5. Make pH or Alkalinity Test.
After boiler and system have been cleaned and

refilled as previously described, test the pH of the

water in the system. This can easily be done by

drawing a small sample of boiler water and testing

hydrion paper which is used in the same manner

as litmus paper, except it gives specific readings.

A color chart on the side of the small hydrion

dispenser gives the reading in pH. Hydrion paper

is inexpensive and obtainable from any chemical

supply house or through your local druggist. The

pH should be higher than 7, but lower than 11. Add

some appropriate water treatment chemicals, if

necessary to bring the pH within the specified range.

6. Boiler is now ready to be put into service.

G.

BOILER AND SYSTEM CLEANING - WATER

BOILERS
1. Filling of Boiler and System --- General --- In a hot

water heating system, the boiler and entire system

(other than the expansion tank) must be full of water

for satisfactory operation. Water should be added to

the system until the boiler pressure gauge registers

normal system design operating pressure. To insure

that the system is full, water should come out of all

air vents when opened.

2. Boiling Out of Boiler and System. The oil and

grease which accumulate in a new hot water boiler

can be washed out in the following manner.
a. Remove safety relief valve using extreme care to

avoid damaging it.

b. Add an appropriate amount of recommended

boilout compound.

c. Reinstall safety relief valve.
d. Fill the entire system with water.
e. Start firing the boiler.
f. Circulate the water through the entire system.
g. Vent the system, including the radiation.
h. Allow boiler water to reach operating

temperature, if possible.

i. Continue to circulate the water for a few hours.
j. Stop firing the boiler.