Checking the package contents – Acer Altos G900 User Manual
Page 46
2 System setup
30
•
Clearance provided for cooling and airflow.
Note: Surge suppressor recommended: In geographic regions
that are susceptible to electrical storms, it is strongly
recommended that you plug the server into a surge suppressor.
Checking the package contents
Remove the server from the packaging container and, using the list
below, check that all parts and accessories are included. Inspect the
server and accessories for damage. If any of the contents appear
damaged, file a damage claim with the carrier immediately.
The Altos G900 system comes with the following parts installed:
•
System components
•
Altos G900 mainboard
•
Altos G900 processor board
•
Altos G900 memory board
•
Fan distribution board
•
Front panel board
•
Hot plug indicator board
•
Power distribution board
•
Two 600-W power supplies
•
Six fan modules
•
3.5-inch floppy drive
•
5.25-inch CD-ROM drive
•
1-inch hard disk drive bay
•
Bezel and feet for tower
•
Three sets (six rails) 5.25-inch peripheral rails and screws
•
Two North American power cords
•
System accessory box
AA G900 ug - EN.book Page 30 Wednesday, September 25, 2002 5:23 PM