beautypg.com

Allied Telesis ALLIEDVIEW-UM 1.6 User Manual

Page 90

background image

Allied Telesis

AlliedView-UM

1.6

User's Guide

PN 613-000381 Rev B

Page 90 of 129

12.4 STARTING

THE

GUI

RESOURCE

FILE

UPDATE

OPERATION

The GUI Resource File Update Operation can only be started when the parameters have been properly

set.

1. Click on the

button.

2. A progress window will be displayed, indicating the overall status of the operation. When the GUI

Resource File Update operation ends, the Operation Logs pane will be updated to contain detailed

information about the operation for each device.

3. Clicking the

or the

button will abort the GUI Resource File Update operation.

Depending on the time this button is clicked, the operation may or may not complete for devices that are

in progress. . Devices that were not able to complete the operation will have a status of “Aborted”.

NOTE:

Aborting an operation may leave some devices in an undesirable state.