beautypg.com

17 scheduling operations – Allied Telesis ALLIEDVIEW-UM 1.6 User Manual

Page 113

background image

Allied Telesis

AlliedView-UM

1.6

User's Guide

PN 613-000381 Rev B

Page 113 of 129

17 SCHEDULING OPERATIONS

Operations can be executed at a specified time using the Operation Scheduling function.

17.1 HOW

TO

SCHEDULE

AN

OPERATION

To schedule an operation, you must first define an operation profile using the methods discussed in the

previous sections of this document.

Once you have created your profile, click on the

button. This will display the Schedule

Task dialog box.

On the Task Name field, enter a name for the operation to be scheduled.
Enter the date and time when the operation will be executed on the Time Schedule field. To set the time,

double click on an element (e.g. Double click on the “09” of the “09 Jun 2004…” on the image above.)

to highlight it. You may then use the spin control to change the value.
Finally, click on the OK button.